ISDEMIR STEEL PLANT

Oven height:5,05 м
Chamber volume:27,3 м3
Number of ovens:69

BATTERY TYPE:

PVR type with twin vertical flues and waste products recirculation.
Heating scheme – mixed gas, underjet type.

Steel structure:4 650 t
Equipment:1 100 t
Materials:20 000 t
Coke machines 
Coke pusher machine:280 t
Door extracting machine:129 t
Coal charging car:92 t
Personnel involved:130

ISDEMIR Steel Plant was commissioned in 1975. Currently it is the biggest plant in Turkey with its production capacity of 3.5 million tons of long and flat products per year.

ISDEMIR Steel Plant – is the only full-cycle plant in Turkey with all stages of the technological process:

    • coke production;
    • sinter and lime production;
    • blast-furnace production;
    • steelmaking production;
    • rolling production;
    • steel-rolling production;
    • auxiliary shops.

In 2008 ISDEMIR Steel Plant started realization of production modernization and transformation investing program (MTI), which apart from commissioning of new facilities for the production of flat products, provided the reconstruction of coke oven battery № 4 as well.

CONCORD GROUP won the tender and began turn-key pad-up reconstruction of coke oven battery №4 including heating up and commissioning of COB №4 with set of corresponded facilities.

  • basic engineering;

  • detailed engineering;

  • basic and auxiliary technological equipment supply;

  • coke machines supply;

  • refractory material supply;

  • supervision of civil works; masonry;

  • assembling of COB technological equipment;

  • replacement of end, intermediary, service benches;

  • dustfree coke pushing manifold with ventilation unit;

  • HPLA pumphouse;

  • interplant pipelines;

  • electrical & instrumentation schemes replacement;

  • complete modernization of automatic process control system;

  • drying and heating up;

  • putting into operation.

Снимок экрана 2019-08-14 в 15.34.32

Image #1

Снимок экрана 2019-08-14 в 15.34.43

Image #2

Снимок экрана 2019-08-14 в 15.34.59

Image #3

Снимок экрана 2019-08-14 в 15.35.08

Image #4

Снимок экрана 2019-08-14 в 15.35.16

Image #5

Снимок экрана 2019-08-14 в 15.19.17

Image #6

Description

In 2008 ISDEMIR Steel Plant started realization of production modernization and transformation investing program (MTI), which apart from commissioning of new facilities for the production of flat products, provided the reconstruction of coke oven battery № 4 as well.

Project details

  • Client: ISDEMIR
  • Location: Iskenderun, TURKEY
  • Completed work
    100%